Dallas February 2015 Luncheon

"Three Grid (ERCOT, SPP & MISO) Energy Storage"

Our speaker, Devesh Sharma, will present on the Wildflower Pump Storage Facility, a plant that will have the ability to serve ERCOT, SPP and MISO with energy and ancillary services. It has the capability to switch between grids in less than 120 seconds. This 1,200 MW plant is equipped with four 300MW ternary units for maximum flexibility and ultra-fast response with black start to full capacity in 90 seconds. It can operate for 24h continuously at maximum output (1,200 MW) and facilitates renewables integration as well as enabling fleet operators to optimize their fleet.

Registration Options

Online registration is now closed. Please contact Donna Foy if you are interested in late registration.

When and Where

Thursday February 26, 2015
11:30 AM